KEY PERSONNEL EXPERIENCE

Our leadership team brings extensive industry expertise, strategic insight, and hands-on experience across diverse sectors.

Barakah Nuclear Power Plant – Abu Dhabi, UAE

Electrical Technical Lead Engineer for refueling outage. Scope included LV/HV switchgear and transformer installation, testing, commissioning, and maintenance during outage activities.

Sharjah Waste to Energy Power Plant – Sharjah, UAE

Client Representative Lead Electrical Engineer. Scope covered LV/MV switchgear, generator transformers, and 33kV substation installation, testing, commissioning, and integration with SEWA grid

SAIH Rawl Combined Cycle Power Station – Oman

Lead Electrical Commissioning Engineer. Scope included design review and commissioning of generator transformers, LV/MV switchgear, and interlock/stability protocols for 165 MW combined cycle plant.

Surhan Gas Process Plant – Uzbekistan

PMC Commissioning Manager. Scope involved commissioning of gas sweetening systems, sulfur recovery units, turbines, and generators, including LV/HV switchgear and transformer energization.

Marafiq Yanbu GTG Rehabilitation – Yanbu, Saudi Arabia

Project Site & Commissioning Manager. Scope included rehabilitation of gas turbine generators, replacement of rotors and auxiliaries, and testing/commissioning of MV/LV switchgear and transformers.

Ras Laffan–Halul Submarine Cable Project – Qatar

Commissioning Manager. Scope covered laying of 132kV submarine cables, construction of GIS substation, and commissioning of transformers and LV/HV switchgear.

Riyadh Power Plant PP09 – Riyadh, Saudi Arabia

Electrical Testing & Commissioning Engineer. Scope included commissioning of 12 GE gas turbines (720 MW), step up transformers, and integration with 380kV substation.

Riyadh Power Plant PP10 – Riyadh, Saudi Arabia

Electrical Commissioning Manager. Scope included commissioning of 2400 MW simple cycle and 4600 MW combined cycle conversion projects, including LV/HV switchgear and generator transformers.

Riyadh Power Plant PP12 – Riyadh, Saudi Arabia

Electrical Commissioning Manager. Scope included commissioning of 8 gas turbines and 2 steam turbines (2175 MW), HRSGs, compressors, LV/HV switchgear, and generator transformers.

Riyadh Power Plant PP7 (Phase 3) – Riyadh, Saudi Arabia

Electrical Commissioning Lead. Scope included commissioning of Siemens gas turbines (172 MW), LV/MV switchgear, and step up transformers integrated with 132kV substation.

COMPANY EXPERIENCE

Our company has built a strong reputation through years of delivering reliable, innovative, and results-driven solutions.

Project:
Hassyan Power Plant – Outage works including 11kV & 33kV switchgear maintenance and 11kV cable partial discharge testing

Client: Extra High Voltage Electromechanical

Project:
Dubai Municipality Desalination Plant – Electrical system testing

Client: Extra High Voltage Electromechanical

Project:
Al Shama Substation – 11kv/33kv switchgear, Transformer maintenance and testing

Client: Extra High Voltage Electromechanical

Project:
Al Ajban Solar PV3 Project – Power & Control Cable & Substation Testing Commissioning works

Client: Power China & Smart Home Technology

Project:
Yarmook Substation, Fujairah Khorfakkan – Substation maintenance works

Client: Scientechnic

Project:
Amaala Utilities PPP Project (40MW) – Relay coordination, short circuit, and grounding calculation study

Client: NexGen Technical Services Co. LLC

Project:
DEWA Package Substation – Lucy Ring Main Unit installation and integration into DEWA network

Client: NexGen Technical Services Co. LLC

Project:
33kV switchgear and transformer preventive and corrective maintenance

Client: Star Cement – Ras Al Khaimah

Project:
Etihad Railway Project, Fujairah – LV system testing and commissioning, 11kv/33kv transformer testing and maintenance

Client: Electrorak – Ras Al Khaimah

Project:
ADDC Package Substation –Electrical equipment Testing, commissioning, and maintenance including transformer, switchgear

Client: PRV Electromechanical Contracting LLC – Abu Dhabi

Project:
Etihad Railway Project, Dubai – LV system testing and commissioning, 11kv/33kv transformer testing and maintenance

Client: Teilink Engineering & Contracting L.L.C

Project:
MBR Solar Power Plant – Package station (Power Block) Testing and Commissioning

Client: Extra High Voltage Electromechanical

Project:
Short Circuit Calculations ETAP Modelling & Power System Studies Load flow and protection coordination analysis

Client: Aggreko

Dubai Electricity and Water Authority / Sharjah Electricity Water and Gas Authority / Etihad Water and Electricity Networks

Substation shutdown maintenance Bay extension and modification works Testing, commissioning, and system restoration

Client: Al Gurg Group

Sharjah Electricity Water and Gas Authority Network
Protection relay retrofit and upgrades Relay testing, configuration, and commissioning System reliability enhancement

Client: Geco Mechanical & Electrical Limited (GECO)

Project:
TAQA Subsstation Network
  • Testing and commissioning of LV/MV switchgear and circuit breakers.
  • Worked on ABB AIS/GIS switchgear panels (Unigear series).
  • Tested and configured protection relays
  • Conducted functional checks, troubleshooting, and commissioning activities.

Client: ABB